Bedford turbo roundabout - it is done

User avatar
gaz
Posts: 14649
Joined: 9 Mar 2007, 12:09pm
Location: Kent

Re: Bedford turbo roundabout - BMF wades in

Post by gaz »

Streetview shows works were in progress in September.

Have they finished yet?

Has anyone actually experienced it?

Found this short blog and video from someone who has, although not as a regular user.
High on a cocktail of flossy teacakes and marmalade
User avatar
mjr
Posts: 20308
Joined: 20 Jun 2011, 7:06pm
Location: Norfolk or Somerset, mostly
Contact:

Re: Bedford turbo roundabout - BMF wades in

Post by mjr »

I understand that it's finished. A supporter (as far as I know) of the scheme reports that it works well (but they would say that wouldn't they?). I may be able to ride it myself in a couple of weeks, making a small detour on a journey. We won't really know who was right until the novelty wears off and there's a year or two of collision data (or non-collision data, hopefully) and traffic data, plus whether the council upgrade the zebras to zebra-toucans when regulations permit (as CCNB seem to think they will).
MJR, mostly pedalling 3-speed roadsters. KL+West Norfolk BUG incl social easy rides http://www.klwnbug.co.uk
All the above is CC-By-SA and no other implied copyright license to Cycle magazine.
User avatar
BSRU
Posts: 265
Joined: 7 Jul 2010, 9:53am

Re: Bedford turbo roundabout - BMF wades in

Post by BSRU »

It's finished and apparently cycling friendly, doesn't look it to me.

http://www.transportxtra.com/magazines/ ... /?id=39719
thirdcrank
Posts: 36776
Joined: 9 Jan 2007, 2:44pm

Re: Bedford turbo roundabout - BMF wades in

Post by thirdcrank »

It would be interesting to have feedback from riders who use this junction, or anybody else living near enough to have a look at the finished product. In particular, it would be good to know what's the farcility provision for cyclists crossing the approaches.
SA_SA_SA
Posts: 2360
Joined: 31 Oct 2009, 1:46pm

Re: Bedford turbo roundabout - BMF wades in

Post by SA_SA_SA »

And how much the zebras affect the capacity when busy with motor traffic, as the capacity calculations seem to pretend they will have no effect thus unfairly favouring this test layout over the tried and tested single lane continental style roundabout:

do drivers stop for waiting pedestrians when the roundabout is operating at full capacity?
------------You may not use this post in Cycle or other magazine ------ 8)
User avatar
[XAP]Bob
Posts: 19793
Joined: 26 Sep 2008, 4:12pm

Re: Bedford turbo roundabout - BMF wades in

Post by [XAP]Bob »

SA_SA_SA wrote:And how much the zebras affect the capacity when busy with motor traffic, as the capacity calculations seem to pretend they will have no effect thus unfairly favouring this test layout over the tried and tested single lane continental style roundabout:

do drivers stop for waiting pedestrians when the roundabout is operating at full capacity?

No, of course not, and at lower capacity pedestrians will have to take their chance...
A shortcut has to be a challenge, otherwise it would just be the way. No situation is so dire that panic cannot make it worse.
There are two kinds of people in this world: those can extrapolate from incomplete data.
User avatar
mjr
Posts: 20308
Joined: 20 Jun 2011, 7:06pm
Location: Norfolk or Somerset, mostly
Contact:

Re: Bedford turbo roundabout - BMF wades in

Post by mjr »

SA_SA_SA wrote:And how much the zebras affect the capacity when busy with motor traffic, as the capacity calculations seem to pretend they will have no effect thus unfairly favouring this test layout over the tried and tested single lane continental style roundabout

This seems to be standard practice: capacity is only reduced by standalone Toucans or if the crossing time is longer than the red phase needed for motorists to make the complementary movement (which explains why we usually get those nasty two-stage crossings of roads at junctions).
MJR, mostly pedalling 3-speed roadsters. KL+West Norfolk BUG incl social easy rides http://www.klwnbug.co.uk
All the above is CC-By-SA and no other implied copyright license to Cycle magazine.
Pete Owens
Posts: 2442
Joined: 7 Jul 2008, 12:52am

Re: Bedford turbo roundabout - BMF wades in

Post by Pete Owens »

BSRU wrote:It's finished and apparently cycling friendly, doesn't look it to me.


Of course it isn't - all the cycle friendly features were ditched at the behest of the motor cyclists.
User avatar
mjr
Posts: 20308
Joined: 20 Jun 2011, 7:06pm
Location: Norfolk or Somerset, mostly
Contact:

Re: Bedford turbo roundabout - BMF wades in

Post by mjr »

Pete Owens wrote:Of course it isn't - all the cycle friendly features were ditched at the behest of the motor cyclists.

Did the previously-praised-by-Pete geometry slacken as well then?
MJR, mostly pedalling 3-speed roadsters. KL+West Norfolk BUG incl social easy rides http://www.klwnbug.co.uk
All the above is CC-By-SA and no other implied copyright license to Cycle magazine.
TonyR
Posts: 5390
Joined: 31 Aug 2008, 12:51pm

Re: Bedford turbo roundabout - BMF wades in

Post by TonyR »

Pete Owens wrote:
BSRU wrote:It's finished and apparently cycling friendly, doesn't look it to me.


Of course it isn't - all the cycle friendly features were ditched at the behest of the motor cyclists.


Never mind. The local facilities campaigners like it. http://www.ccnb.org.uk/responsesb.html
User avatar
BSRU
Posts: 265
Joined: 7 Jul 2010, 9:53am

Re: Bedford turbo roundabout - BMF wades in

Post by BSRU »

Pete Owens wrote:
BSRU wrote:It's finished and apparently cycling friendly, doesn't look it to me.


Of course it isn't - all the cycle friendly features were ditched at the behest of the motor cyclists.


It was never cycle friendly.
thirdcrank
Posts: 36776
Joined: 9 Jan 2007, 2:44pm

Re: Bedford turbo roundabout - BMF wades in

Post by thirdcrank »

Apologies for blatantly bouncing this in the hope of hearing from somebody who's seen it since it was finished.
Tonyf33
Posts: 3926
Joined: 17 Nov 2007, 3:31pm
Location: Letchworth N.Herts

Re: Bedford turbo roundabout - BMF wades in

Post by Tonyf33 »

thirdcrank wrote:Apologies for blatantly bouncing this in the hope of hearing from somebody who's seen it since it was finished.

IF (that's a big IF BTW) I can be bothered and the weather holds out I might have a trundle that way next week, think there are a few on here closer though.

It'd be interesting to see if it has had any impact on kids cycling to/from school, tbh i just don't think there's enough within this to make that much of a difference (to cyclists), it certainly isn't going to get droves of people onto bikes (because they'll feel or actually be safer) because beyond the roundabout there's nothing that screams lots of space & 'safe' cycling anyways.
thirdcrank
Posts: 36776
Joined: 9 Jan 2007, 2:44pm

Re: Bedford turbo roundabout - BMF wades in

Post by thirdcrank »

Tonyf33

I'll look forward to your review.

The things which at some time or other have been going to make this development more cycle-friendly and therefore appropriate for funding from some cycling money or other have been IIRC

Tighter, speed reducing geometry
"Turbo" lanes on the carriageway of the roundabout
The ability of cyclists to benefit from the pedestrian crossings without the requirement to dismount.

There are probably others that I've forgotten. I've tried to use the most general language to avoid any dispute with anybody about what may have been promised / hoped for / not a chance in hell of. IMO, if there's to be any further fruitful discussion of this, we need to know what's been provided.
thirdcrank
Posts: 36776
Joined: 9 Jan 2007, 2:44pm

Re: Bedford turbo roundabout - BMF wades in

Post by thirdcrank »

Can anybody say what arrangements have been made for cyclists at the pedestrian crossings? I ask because it seems that pedestrian crossings with an adjacent cycle path are being installed elsewhere. Earlier in the thread there was a link to the CTC website where it said something along the lines that the regulations would be changed but not in time for this scheme.

I've tried to check if there are new regultions or amendments to the 1997 regs and I've been unsuccessful.

The Bedford Borough Council page titled Pedestrian Crossings (which also has information about toucan crossings and equestrian crossings) just lists the standard menagerie.

http://www.bedford.gov.uk/transport_and ... sings.aspx
======================================================================
Edit to add: I've answered my own question by looking in the obvious place - the Bedford BC www

Can I cycle across the zebra crossings?

Cyclists should dismount and push their bikes across zebra crossings giving them right of way. A national consultation has been carried out on a new form of zebra crossing which will allow cyclists to cycle across with right of way over motorists. At the time of construction the new design had not been approved to allow us to install this form of crossing. We have constructed the crossings in such a way that when these crossings are approved next year, as we are given to understand, we can easily install them without the need to remove existing lines. Should this crossing not be approved we will widen the stripes on the zebra crossings to the full width giving more room to accommodate pedestrians and those cyclists pushing their bikes.


http://www.bedford.gov.uk/council_and_d ... wered.aspx

NB Written by somebody who doesn't understand the difference between right-of-way and precedence.
Post Reply